Example of Successful Project Contract Manufacturing

  • Technical Requirement: ANSI/IEEE C37.20.7, Arc-Resistant
  • Annual Volume: 500 pcs
  • Original Cost: $2,800
  • Project Time: 7 months
  • New Cost: $1,500
  • Saving: $1,300 each
  • Annual Saving: $650,000
Scroll to Top